Buy Construction Project Scheduling and Control by Saleh A. Mubarak
close menu
Bookswagon
search
My Account
Book 1
Book 2
Book 3
Book 1
Book 2
Book 3
Book 1
Book 2
Book 3
Book 1
Book 2
Book 3
Home > Science, Technology & Agriculture > Civil engineering, surveying and building > Building construction and materials > Construction Project Scheduling and Control: Red Vector Bundle
Construction Project Scheduling and Control: Red Vector Bundle

Construction Project Scheduling and Control: Red Vector Bundle


     0     
5
4
3
2
1



Out of Stock


Notify me when this book is in stock
X
About the Book

Written by a career construction professional, this text about scheduling and project control addresses the average student, detailing all the steps clearly and without shortcuts. And now, for the first time, the book is part of a learning package that comes with access to an online course built around the book provided by online training leader Red Vector. Solved and unsolved exercises cover all subjects and computer software programs for construction are included for each chapter. The book, and by extension the class, presents precedence networks as the realistic solution to scheduling, the main part of project control, and introduces new concepts in CPM scheduling such as the author's own Dynamic Minimum Lag technique. The new edition includes coverage of building image modeling (BIM), lean construction, sustainability, and other cutting edge construction topics.

Table of Contents:
Preface ix Preface to the First Edition xiii Chapter 1 Introduction 1 Planning and Scheduling 2 Project Control 8 Why Schedule Projects? 8 The Scheduler 10 Scheduling and Project Management 12 Chapter 1 Exercises 12 Chapter 2 Bar (Gantt) Charts 15 Definition and Introduction 16 Advantages of Bar Charts 19 Disadvantages of Bar Charts 20 Chapter 2 Exercises 21 Chapter 3 Basic Networks 23 Definition and Introduction 24 Arrow Networks 24 Node Networks 32 Comparison of Arrow and Node Networks 38 Networks versus Bar Charts 39 Time-Scaled Logic Diagrams 40 Chapter 3 Exercises 41 Chapter 4 The Critical Path Method (CPM) 45 Introduction 46 Steps Required to Schedule a Project 47 Supplemental Steps 54 Resource Allocation and Leveling 56 Beginning-of-Day or End-of-Day Convention 58 The CPM Explained through Examples 58 Logic and Constraints 81 Chapter 4 Exercises 84 Chapter 5 Precedence Networks 91 Definition and Introduction 92 The Four Types of Relationships 95 The Percent Complete Approach 96 Fast-Track Projects 97 A Parallel Predecessor? 99 CPM Calculations for Precedence Diagrams 100 The Detailed Approach 108 The Critical Path Revisited 117 Final Discussion 117 Chapter 5 Exercises 119 Chapter 6 Resource Allocation and Resource Leveling 123 Introduction 124 The Three Categories of Resources 124 What Is Resource Allocation? 125 Resource Leveling 125 Materials Management 148 Chapter 6 Exercises 151 Chapter 7 Schedule Updating and Project Control 155 Introduction 156 The Need for Schedule Updating 156 Project Control Defined 156 Schedule Updating 157 Project Control 184 Chapter 7 Exercises 205 Chapter 8 Schedule Compression and Time-Cost Trade-Off 211 Introduction 212 Setting Priorities 213 Accelerating a Project 213 Construction versus Manufacturing 221 Direct and Indirect Costs 224 Recovery Schedules 231 Accelerating Projects Using Computers 236 Potential Issues with Uncoordinated Project Acceleration 237 Chapter 8 Exercises 244 Chapter 9 Reports and Presentations 247 Introduction 248 The Difference between Reports and Presentations 252 Skills Necessary for Giving Good Presentations 254 The Power of Presentations 255 Reviewing Reports before and after Printing 257 General Tips on Printing Reports 258 Summary Reports 259 Paper or Electronic Reports? 259 E-Reports 262 Communications in the International Environment 263 Chapter 9 Exercises 264 Chapter 10 Scheduling as Part of the Project Management Effort 267 Introduction 268 Project Objectives 269 Defining and Measuring Project Success 270 Scheduling and Estimating 271 Estimating and Accounting 278 Scheduling and Accounting 279 Scheduling and Change Orders 280 Paperless Project Management 281 Procurement Management 281 Management of Submittals 283 The Master Schedule and Subschedules 284 Multiproject Management 286 Time Contingency and Management Options 287 Chapter 10 Exercises 290 Chapter 11 Other Scheduling Methods 291 Introduction 292 Program Evaluation and Review Technique (PERT) 292 Graphical Evaluation and Review Technique (GERT) 309 Linear Scheduling Method (LSM) 310 LSM and Project Schedule Acceleration 316 Chapter 11 Exercises 326 Chapter 12 Dynamic Minimum Lag Relationship 329 Introduction 330 Similarity between the DML Concept and the Linear Scheduling Method (LSM) 331 How Does DML Work? 332 DML Relationship in CPM Calculations 334 Conclusion 340 Chapter 12 Exercises 342 Chapter 13 Construction Delay and Other Claims 343 Preface 344 Introduction 344 Delay Claims 344 Reasons for Claims 346 Force Majeure 348 Types of Delays 349 Scheduling Mistakes Related to Delay Claims 350 Project Documentation 353 Delay Claims Resolution 356 The Importance of CPM Schedules in Delay Claims 358 Methods of Schedule Analysis 359 Chapter 13 Exercises 366 Chapter 14 Schedule Risk Management 367 Introduction 368 Types of Risk in Construction Projects 369 Schedule Risk Types 369 Definition of Risk Terms 375 Importance of Good Planning for Risk Management 377 Importance of Good CPM Scheduling Practices for Risk Assessment 377 Risk Shifting in Contracts 379 Schedule Risk Management Steps 381 Expected Value 387 Application in Scheduling 388 Examples of Risk Adjustment 389 Conclusion 390 Chapter 14 Exercises 390 Chapter 15 BIM-Based 4D Modeling and Scheduling 393 Overview of the Building Information Modeling (BIM) 393 Case Study 399 Chapter 15 Exercises 420 Appendix A Computer Project 421 General Guidelines 421 Cost Loading 426 Updating the Project 428 Change Order 429 Resource Leveling 430 Schedule Compression 431 Schedule Compression 2 433 Delay Claim 1: Unforeseen Conditions 433 Delay Claim 2: Change in the Owner s Requirements 433 Appendix B Sample Reports 435 Tabular Reports 435 Graphic Reports 453 Abbreviations 464 Glossary 469 References 493 Bibliography 498 Index 505


Best Sellers


Product Details
  • ISBN-13: 9781119104735
  • Publisher: John Wiley & Sons Inc
  • Publisher Imprint: John Wiley & Sons Inc
  • Height: 250 mm
  • No of Pages: 528
  • Sub Title: Red Vector Bundle
  • Width: 150 mm
  • ISBN-10: 1119104734
  • Publisher Date: 13 Apr 2015
  • Binding: Hardback
  • Language: English
  • Spine Width: 15 mm
  • Weight: 666 gr


Similar Products

Add Photo
Add Photo

Customer Reviews

REVIEWS      0     
Click Here To Be The First to Review this Product
Construction Project Scheduling and Control: Red Vector Bundle
John Wiley & Sons Inc -
Construction Project Scheduling and Control: Red Vector Bundle
Writing guidlines
We want to publish your review, so please:
  • keep your review on the product. Review's that defame author's character will be rejected.
  • Keep your review focused on the product.
  • Avoid writing about customer service. contact us instead if you have issue requiring immediate attention.
  • Refrain from mentioning competitors or the specific price you paid for the product.
  • Do not include any personally identifiable information, such as full names.

Construction Project Scheduling and Control: Red Vector Bundle

Required fields are marked with *

Review Title*
Review
    Add Photo Add up to 6 photos
    Would you recommend this product to a friend?
    Tag this Book Read more
    Does your review contain spoilers?
    What type of reader best describes you?
    I agree to the terms & conditions
    You may receive emails regarding this submission. Any emails will include the ability to opt-out of future communications.

    CUSTOMER RATINGS AND REVIEWS AND QUESTIONS AND ANSWERS TERMS OF USE

    These Terms of Use govern your conduct associated with the Customer Ratings and Reviews and/or Questions and Answers service offered by Bookswagon (the "CRR Service").


    By submitting any content to Bookswagon, you guarantee that:
    • You are the sole author and owner of the intellectual property rights in the content;
    • All "moral rights" that you may have in such content have been voluntarily waived by you;
    • All content that you post is accurate;
    • You are at least 13 years old;
    • Use of the content you supply does not violate these Terms of Use and will not cause injury to any person or entity.
    You further agree that you may not submit any content:
    • That is known by you to be false, inaccurate or misleading;
    • That infringes any third party's copyright, patent, trademark, trade secret or other proprietary rights or rights of publicity or privacy;
    • That violates any law, statute, ordinance or regulation (including, but not limited to, those governing, consumer protection, unfair competition, anti-discrimination or false advertising);
    • That is, or may reasonably be considered to be, defamatory, libelous, hateful, racially or religiously biased or offensive, unlawfully threatening or unlawfully harassing to any individual, partnership or corporation;
    • For which you were compensated or granted any consideration by any unapproved third party;
    • That includes any information that references other websites, addresses, email addresses, contact information or phone numbers;
    • That contains any computer viruses, worms or other potentially damaging computer programs or files.
    You agree to indemnify and hold Bookswagon (and its officers, directors, agents, subsidiaries, joint ventures, employees and third-party service providers, including but not limited to Bazaarvoice, Inc.), harmless from all claims, demands, and damages (actual and consequential) of every kind and nature, known and unknown including reasonable attorneys' fees, arising out of a breach of your representations and warranties set forth above, or your violation of any law or the rights of a third party.


    For any content that you submit, you grant Bookswagon a perpetual, irrevocable, royalty-free, transferable right and license to use, copy, modify, delete in its entirety, adapt, publish, translate, create derivative works from and/or sell, transfer, and/or distribute such content and/or incorporate such content into any form, medium or technology throughout the world without compensation to you. Additionally,  Bookswagon may transfer or share any personal information that you submit with its third-party service providers, including but not limited to Bazaarvoice, Inc. in accordance with  Privacy Policy


    All content that you submit may be used at Bookswagon's sole discretion. Bookswagon reserves the right to change, condense, withhold publication, remove or delete any content on Bookswagon's website that Bookswagon deems, in its sole discretion, to violate the content guidelines or any other provision of these Terms of Use.  Bookswagon does not guarantee that you will have any recourse through Bookswagon to edit or delete any content you have submitted. Ratings and written comments are generally posted within two to four business days. However, Bookswagon reserves the right to remove or to refuse to post any submission to the extent authorized by law. You acknowledge that you, not Bookswagon, are responsible for the contents of your submission. None of the content that you submit shall be subject to any obligation of confidence on the part of Bookswagon, its agents, subsidiaries, affiliates, partners or third party service providers (including but not limited to Bazaarvoice, Inc.)and their respective directors, officers and employees.

    Accept


    Inspired by your browsing history


    Your review has been submitted!

    You've already reviewed this product!