Schedule Delay Analysis
Home > Science, Technology & Agriculture > Civil engineering, surveying and building > Building construction and materials > Schedule Delay Analysis: (Standards)
Schedule Delay Analysis: (Standards)

Schedule Delay Analysis: (Standards)


     0     
5
4
3
2
1



Out of Stock


Notify me when this book is in stock
X
About the Book

Prepared by the Schedule Delay Analysis Standard Committee of the Construction Institute of ASCE. Schedule Delay Analysis, Standard ANSI/ASCE/CI 67-17, presents guiding principles that can be used on construction projects to determine the impact of delays. Critical path method (CPM) schedules can be of evidential value to demonstrate causation and liability and to apportion delays when they occur on a project. CPM schedules will influence the quantification of delay and, ultimately, whether a party was damaged by a delay. This standard provides 35 guidelines that allow for segmentation of responsibility for delays to intermediary milestones and project completion dates. The guidelines enable the calculation of delay damages or liquidated damages by using CPM schedule techniques and preparing a schedule delay analysis. Each guideline is accompanied by commentary that explains the reasoning behind and application of that principle. Topics include scope and definitions; critical path, float, and early completion; chronology of delay, concurrent delay, and responsibility for delay; changing schedules after the fact, and acceleration. Standard ASCE 67-17 reflects the best engineering principles associated with schedule delay analysis, as well as the standard of practice in the U.S. construction industry. It is an essential reference for construction engineers, project managers, owners, and contracting agents.

Table of Contents:
ACKNOWLEDGMENTS 1 INTRODUCTION 2 SCOPE 3 DEFINITIONS 4 CRITICAL PATH 4.1 Because the Critical Path is Dynamic, Delays Should be Evaluated Based on the Critical Path During Each Delay 4.2 Contemporaneous Schedules Should be Maintained to Reflect Actual Performance, the Plan to Complete the Work, and Delay, Should it Occur 4.3 Delay Must be Critical to the Current Adjusted Completion Date for Consideration of a Time Extension 4.4 Delay Should Generally be Measured by the Change to the Scheduled Completion Date Caused by the Delay 4.5 Excusable Delays are Typically Events Outside the Contractor’s Control and Entitle the Contractor to a time Extension 4.6 In Situations Where the Completion Date is Adjusted Properly for Change Orders and the Contractor is Behind Schedule, Owner Delays that Occur Thereafter on a Separate Path may have a Mitigating Effect on Assessment of Damages 4.7 For A Delay To Be Compensable, it should be the Sole Cause of Delay 5 FLOAT 5.1 Activities with Float are not Critical 5.2 Float is Owned by the Project 5.3 Excessive Constraints on Activities that Interfere with a Logic-driven Critical Path may Complicate Evaluation of Critical Delays and Should be Considered in a Delay Analysis 5.4 If Multiple Milestones have Delay Damages Associated with them, a Separate Delay Analysis Should be Performed for each Milestone 6 EARLY COMPLETION 6.1 A Plan to Finish Early Should be Reasonable 6.2 Generally, the Contractor may be Allowed to Collect Delay Damages to an early Completion Schedule but may not Collect an Excusable Time Extension Until the Scheduled Completion Date Exceeds the Contract Completion Date 7 CHRONOLOGY OF DELAY 7.1 Delays Should be Evaluated as they Occur in Chronological Sequence 7.2 A Schedule Delay Analysis should Reflect an Analysis of Prior Entitlement so as to Reflect a Current Adjusted Completion Date Prior to Evaluating Delay 7.3 Consideration should be Included as to how Delays were Evaluated by the Participants During the Project 7.4 Evaluation of Delay Chronology should be Documented and Supported with Contemporaneous Records 8 CONCURRENT DELAY 8.1 Concurrent Delay can be Described as a Situation where Two or More Critical Delays are Occurring at the same time During all or a Portion of the Delay Time Frame in which the Delays are Occurring 8.2 Concurrent Delay Typically is Excusable but Noncompensable, Meaning a Time Extension is Given but no Costs are Recovered by Either Party 8.3 Concurrent Delay should be Apportioned where Possible Schedule Delay Analysis v 9 RESPONSIBILITY FOR DELAY 9.1 A Schedule Expert Typically can Identify the Party Responsible for a Delay from the Contemporaneous Records, Interviewing Project Personnel, and Reading Deposition Testimony, and may Rely on Technical Experts or Fact Witnesses in Opining on Liability 9.2 During a Project, the Contractor should Provide the Owner with a Notice of Delay for Excusable Delays, Followed by a Request for a Change in Accordance with the Contract 9.3 Responsibility Analysis should be Supported by a Factual Chronology Based on the Contemporaneous Project Performance Records and Referencing the Remedy Granting Clause of the Contract 9.4 The Schedule Expert should Attempt to Discuss the Issue with the Individual Directly Involved and Who has Factual Knowledge of the Delay Issue, where Feasible 9.5 Schedule Experts should not Opine Beyond their Expertise. if Necessary, a Technical Expert should be Engaged on whose Opinion the Schedule Expert can Rely 9.6 Once a Technical Expert’s Finding as to which Party was Liable for the Delay Event is Formed, a Legal Review may be made with Counsel Consistent with Legal Precedent in the Project Jurisdiction 10 CHANGING SCHEDULES AFTER THE FACT 10.1 The Schedules should be Presumed Correct as they were Used During the Project, Unless Otherwise shown to be Inaccurate 10.2 After-the-fact Changes to Schedules Used During the Project should be Minimized and only made where Necessary 10.3 Any Changes made to the Contemporaneous Record of Project Schedules should be Carefully Identified and Documented 10.4 When Possible, the Preference for Dealing with Inaccurate Schedules after the Fact is to make Corrections, Rather than Abandon the Schedules, Subject to the Nature and Scope of the Corrections 10.5 Changes to Schedules Generally may be made to Correct Necessary Physical or Contractual Constraints but Typically not the Contractor’s Preferential Sequencing 11 ACCELERATION 11.1 Parties have the Right to Voluntarily Accelerate, Subject to Contract Terms and Conditions 11.2 For Owner-directed Acceleration, the Parties should Agree on the Acceleration Plan Prior to Implementation. The Right to direct Acceleration Unilaterally should be Addressed by Contract 11.3 Constructive Acceleration can be Proved 11.4 When Implementing an Acceleration Plan, Acceleration of Multiple Paths in the Schedule may be Required 12 REFERENCES


Best Sellers


Product Details
  • ISBN-13: 9780784414361
  • Publisher: American Society of Civil Engineers
  • Publisher Imprint: American Society of Civil Engineers
  • Height: 279 mm
  • No of Pages: 33
  • Weight: 120 gr
  • ISBN-10: 078441436X
  • Publisher Date: 30 Nov 2017
  • Binding: Paperback
  • Language: English
  • Series Title: Standards
  • Width: 229 mm


Similar Products

Add Photo
Add Photo

Customer Reviews

REVIEWS      0     
Click Here To Be The First to Review this Product
Schedule Delay Analysis: (Standards)
American Society of Civil Engineers -
Schedule Delay Analysis: (Standards)
Writing guidlines
We want to publish your review, so please:
  • keep your review on the product. Review's that defame author's character will be rejected.
  • Keep your review focused on the product.
  • Avoid writing about customer service. contact us instead if you have issue requiring immediate attention.
  • Refrain from mentioning competitors or the specific price you paid for the product.
  • Do not include any personally identifiable information, such as full names.

Schedule Delay Analysis: (Standards)

Required fields are marked with *

Review Title*
Review
    Add Photo Add up to 6 photos
    Would you recommend this product to a friend?
    Tag this Book Read more
    Does your review contain spoilers?
    What type of reader best describes you?
    I agree to the terms & conditions
    You may receive emails regarding this submission. Any emails will include the ability to opt-out of future communications.

    CUSTOMER RATINGS AND REVIEWS AND QUESTIONS AND ANSWERS TERMS OF USE

    These Terms of Use govern your conduct associated with the Customer Ratings and Reviews and/or Questions and Answers service offered by Bookswagon (the "CRR Service").


    By submitting any content to Bookswagon, you guarantee that:
    • You are the sole author and owner of the intellectual property rights in the content;
    • All "moral rights" that you may have in such content have been voluntarily waived by you;
    • All content that you post is accurate;
    • You are at least 13 years old;
    • Use of the content you supply does not violate these Terms of Use and will not cause injury to any person or entity.
    You further agree that you may not submit any content:
    • That is known by you to be false, inaccurate or misleading;
    • That infringes any third party's copyright, patent, trademark, trade secret or other proprietary rights or rights of publicity or privacy;
    • That violates any law, statute, ordinance or regulation (including, but not limited to, those governing, consumer protection, unfair competition, anti-discrimination or false advertising);
    • That is, or may reasonably be considered to be, defamatory, libelous, hateful, racially or religiously biased or offensive, unlawfully threatening or unlawfully harassing to any individual, partnership or corporation;
    • For which you were compensated or granted any consideration by any unapproved third party;
    • That includes any information that references other websites, addresses, email addresses, contact information or phone numbers;
    • That contains any computer viruses, worms or other potentially damaging computer programs or files.
    You agree to indemnify and hold Bookswagon (and its officers, directors, agents, subsidiaries, joint ventures, employees and third-party service providers, including but not limited to Bazaarvoice, Inc.), harmless from all claims, demands, and damages (actual and consequential) of every kind and nature, known and unknown including reasonable attorneys' fees, arising out of a breach of your representations and warranties set forth above, or your violation of any law or the rights of a third party.


    For any content that you submit, you grant Bookswagon a perpetual, irrevocable, royalty-free, transferable right and license to use, copy, modify, delete in its entirety, adapt, publish, translate, create derivative works from and/or sell, transfer, and/or distribute such content and/or incorporate such content into any form, medium or technology throughout the world without compensation to you. Additionally,  Bookswagon may transfer or share any personal information that you submit with its third-party service providers, including but not limited to Bazaarvoice, Inc. in accordance with  Privacy Policy


    All content that you submit may be used at Bookswagon's sole discretion. Bookswagon reserves the right to change, condense, withhold publication, remove or delete any content on Bookswagon's website that Bookswagon deems, in its sole discretion, to violate the content guidelines or any other provision of these Terms of Use.  Bookswagon does not guarantee that you will have any recourse through Bookswagon to edit or delete any content you have submitted. Ratings and written comments are generally posted within two to four business days. However, Bookswagon reserves the right to remove or to refuse to post any submission to the extent authorized by law. You acknowledge that you, not Bookswagon, are responsible for the contents of your submission. None of the content that you submit shall be subject to any obligation of confidence on the part of Bookswagon, its agents, subsidiaries, affiliates, partners or third party service providers (including but not limited to Bazaarvoice, Inc.)and their respective directors, officers and employees.

    Accept

    New Arrivals


    Inspired by your browsing history


    Your review has been submitted!

    You've already reviewed this product!