Delay Analysis in Construction Contracts
Home > Science, Technology & Agriculture > Civil engineering, surveying and building > Building construction and materials > Delay Analysis in Construction Contracts
19%
Delay Analysis in Construction Contracts

Delay Analysis in Construction Contracts

|
     0     
5
4
3
2
1




Out of Stock


Notify me when this book is in stock
About the Book

The most significant unanticipated costs on many construction projects are the financial impacts associated with delay and disruption to the works. Assessing these, and establishing a causal link from each delay event to its effect, contractual liability and the damages experienced as a direct result of each event, can be difficult and complex. This book is a practical guide to the process of delay analysis and includes an in-depth review of the primary methods of delay analysis, together with the assumptions that underlie the precise calculations required in any quantitative delay analysis. The techniques discussed can be used on projects of any size, under all forms of construction contract, both domestic and international. The authors discuss not only delay analysis techniques, but also their appropriateness under given circumstances, demonstrating how combined approaches may be applied where necessary. They also consider problematic issues including 'who owns the float', concurrent delay, early completion programmes, and disruption. The book, which is well illustrated, features practical worked examples and case studies demonstrating the techniques commonly used by experienced practitioners. This is an invaluable resource to contractors, architects, engineers, surveyors, programmers and delay analysts, and will also be of interest to clients' professional advisors managing extension of time or delay claims, as well as construction lawyers who require a better understanding of the underlying assumptions on which many quantitative delay analyses are based.

Table of Contents:
Preface. 1 Introduction. 1.1 General. 1.1.1 Purpose of 'delay analysis in construction'. 1.1.2 Guidance. 1.1.3 Construction planning and programming. 1.2 Construction delays. 1.2.1 Identifying delays. 1.2.2 Analysing construction delays. 1.2.3 Delay claim life-cycle. 1.3 Burning issues in delay analysis. 1.4 Presentation and case study. 2 Construction Programmes. 2.1 Introduction. 2.1.1 Planning, Programming and Project Controls. 2.1.2 Elements of a successful project. 2.2 Planning and Programming. 2.2.1 Project Planning. 2.2.2 Work Breakdown Structure. 2.3 CPM Programming Techniques; the Fundamentals. 2.3.1 Activity Durations. 2.3.2 Activity Relationships. 2.3.3 Event Date Calculations. 2.3.4 Forward Pass. 2.3.5 Backward Pass. 2.3.6 Total Float. 2.3.7 Constraints. 2.4 Baseline Validation. 2.4.1 Joint Baseline Review. 2.4.2 Programme Approval. 2.4.3 The Project Baseline. 2.5 Other Planning Techniques. 2.5.1 PERT - Project Evaluation and Review Technique. 2.5.2 Gantt Charts (Bar Charts). 2.5.3 Line of Balance. 2.5.4 Critical Chain Method/Theory of Constraints. 2.6 Why use CPM Planning or Scheduling Techniques?. 2.6.1 Project Management. 2.6.2 As-planned programmes. 2.7 Project Controls and the Project Control Cycle. 2.7.1 Progress Monitoring. 2.7.2 Process and Analyse Information, Earned Value Method. 2.7.3 The Cost and Schedule Performance Curves. 2.7.4 Time Control. 2.7.5 Programme Updates. 2.8 Records, Records, Records... 2.8.1 Electronic Records. 2.9 Predatory Programming Practices. 2.10 Guidance. 3 Identification of Construction Delays. 3.1 Establishing a Basis for Identifying Delay. 3.1.1 General Requirements. 3.1.2 Validation of an As-Planned Programme. 3.2 Factual Evidence and As-Built Programmes. 3.2.1 As-Built Programme Preparation. 3.2.2 Summary. 3.3 Identification of Delay Events. 3.3.1 Delay Identification. 3.3.2 Recording Delays. 3.4 Identification and Analysis of Disruption. 3.4.1. Disruption and Delay. 3.4.2 Calculating Disruption. 3.4.3 Establishing Cause. 3.4.4 Total Cost Claims/Global Claims. 3.4.5 Measured Mile. 3.4.6 Graphical Presentation. 3.4.7 Summary. 4 Analysis of Construction Delays. 4.1 Introduction to Delay Analysis Techniques. 4.1.1 The use of CPM techniques. 4.1.2 Project Planning Software. 4.1.3 Identifying Delays - Cause or Effect?. 4.2 Explanation of the Available Techniques. 4.2.1 Additive Methods of Delay Analysis. 4.2.2 Impacted As-Planned. 4.2.3 Time Impact Analysis. 4.2.4 Collapsed As-Built. 4.2.5 As-Built Based Methods of Analysis. 4.2.6 Total Time Assessments. 4.2.7 As-Planned versus As-Built Windows Analysis. 4.2.8 Contemporaneous Windows Analysis. 4.2.9 Month-to-Month Update Analysis. 4.3 Selection Criteria and Guidance. 4.3.1 The SCL Delay and Disruption Protocol. 4.3.2 The Core Statements of Principle. 4.3.3 Recommended Practice No. 29R-03 'Forensic Schedule Analysis'. 4.3.4 Which technique to use under given circumstances. 4.4 Summary. 5 Problematic Issues. 5.1 Introduction. 5.2 Float and Delay Claims. 5.2.1 General Definitions -- What is 'Float'?. 5.2.2 How Float is used. 5.2.3 Float Loss and the Impact. 5.2.4 Measurement of Float Loss. 5.2.5 Who Owns the Float?. 5.3 Concurrency. 5.3.1 Definitions. 5.3.2 Delay Analysis and Concurrency. 5.3.3 SCL Delay and Disruption Protocol. 5.3.4 Delay Scenarios. 5.3.5 Common Questions. 5.3.6 Experience and Commonsense. 5.3.7 The Concept of Pacing. 5.4 Programme Approvals and Onerous Specifications. 5.4.1 Programme Requirements, Format and Compliance. 5.4.2 Approval or Acceptance of Construction Programme. 5.5 Acceleration and Mitigation. 5.5.1 Mitigation. 5.5.2 Acceleration. 5.5.3 Contractors' right to early completion. 6 Effective Presentation of Delay Analysis. 6.1 Introduction. 6.2 Case Study - Airport Terminal Expansion. 6.2.1 Initial analysis by party appointed planning experts. 6.2.2 Using Time Impact Analysis for Prolongation. 6.2.3 Tribunal Planning Expert's Contemporaneous Approach. 6.2.4 Runway Extension - Are delays to the Runway Extension relevant?. 6.2.5 Terminal Building - Are delays to the Terminal Building relevant?. 6.3 Float Mapping - Approach and Methodology. 6.3.1 Extracting Float Values. 6.3.2 Create Float Map. 6.3.3 Identify Driving Activities. 6.3.4 As-Built Critical Path. 6.4 Demonstrating Acceleration. 6.5 Presentation Skills - Demonstrative Evidence. 6.5.1 Summary. Index


Best Sellers


Product Details
  • ISBN-13: 9781444301144
  • Publisher: John Wiley and Sons Ltd
  • Publisher Imprint: Wiley-Blackwell (an imprint of John Wiley & Sons Ltd)
  • Height: 252 mm
  • Returnable: N
  • Weight: 786 gr
  • ISBN-10: 1444301144
  • Publisher Date: 10 Feb 2009
  • Binding: Other digital
  • Language: English
  • Spine Width: 20 mm
  • Width: 181 mm


Similar Products

Add Photo
Add Photo

Customer Reviews

REVIEWS      0     
Click Here To Be The First to Review this Product
Delay Analysis in Construction Contracts
John Wiley and Sons Ltd -
Delay Analysis in Construction Contracts
Writing guidlines
We want to publish your review, so please:
  • keep your review on the product. Review's that defame author's character will be rejected.
  • Keep your review focused on the product.
  • Avoid writing about customer service. contact us instead if you have issue requiring immediate attention.
  • Refrain from mentioning competitors or the specific price you paid for the product.
  • Do not include any personally identifiable information, such as full names.

Delay Analysis in Construction Contracts

Required fields are marked with *

Review Title*
Review
    Add Photo Add up to 6 photos
    Would you recommend this product to a friend?
    Tag this Book Read more
    Does your review contain spoilers?
    What type of reader best describes you?
    I agree to the terms & conditions
    You may receive emails regarding this submission. Any emails will include the ability to opt-out of future communications.

    CUSTOMER RATINGS AND REVIEWS AND QUESTIONS AND ANSWERS TERMS OF USE

    These Terms of Use govern your conduct associated with the Customer Ratings and Reviews and/or Questions and Answers service offered by Bookswagon (the "CRR Service").


    By submitting any content to Bookswagon, you guarantee that:
    • You are the sole author and owner of the intellectual property rights in the content;
    • All "moral rights" that you may have in such content have been voluntarily waived by you;
    • All content that you post is accurate;
    • You are at least 13 years old;
    • Use of the content you supply does not violate these Terms of Use and will not cause injury to any person or entity.
    You further agree that you may not submit any content:
    • That is known by you to be false, inaccurate or misleading;
    • That infringes any third party's copyright, patent, trademark, trade secret or other proprietary rights or rights of publicity or privacy;
    • That violates any law, statute, ordinance or regulation (including, but not limited to, those governing, consumer protection, unfair competition, anti-discrimination or false advertising);
    • That is, or may reasonably be considered to be, defamatory, libelous, hateful, racially or religiously biased or offensive, unlawfully threatening or unlawfully harassing to any individual, partnership or corporation;
    • For which you were compensated or granted any consideration by any unapproved third party;
    • That includes any information that references other websites, addresses, email addresses, contact information or phone numbers;
    • That contains any computer viruses, worms or other potentially damaging computer programs or files.
    You agree to indemnify and hold Bookswagon (and its officers, directors, agents, subsidiaries, joint ventures, employees and third-party service providers, including but not limited to Bazaarvoice, Inc.), harmless from all claims, demands, and damages (actual and consequential) of every kind and nature, known and unknown including reasonable attorneys' fees, arising out of a breach of your representations and warranties set forth above, or your violation of any law or the rights of a third party.


    For any content that you submit, you grant Bookswagon a perpetual, irrevocable, royalty-free, transferable right and license to use, copy, modify, delete in its entirety, adapt, publish, translate, create derivative works from and/or sell, transfer, and/or distribute such content and/or incorporate such content into any form, medium or technology throughout the world without compensation to you. Additionally,  Bookswagon may transfer or share any personal information that you submit with its third-party service providers, including but not limited to Bazaarvoice, Inc. in accordance with  Privacy Policy


    All content that you submit may be used at Bookswagon's sole discretion. Bookswagon reserves the right to change, condense, withhold publication, remove or delete any content on Bookswagon's website that Bookswagon deems, in its sole discretion, to violate the content guidelines or any other provision of these Terms of Use.  Bookswagon does not guarantee that you will have any recourse through Bookswagon to edit or delete any content you have submitted. Ratings and written comments are generally posted within two to four business days. However, Bookswagon reserves the right to remove or to refuse to post any submission to the extent authorized by law. You acknowledge that you, not Bookswagon, are responsible for the contents of your submission. None of the content that you submit shall be subject to any obligation of confidence on the part of Bookswagon, its agents, subsidiaries, affiliates, partners or third party service providers (including but not limited to Bazaarvoice, Inc.)and their respective directors, officers and employees.

    Accept

    New Arrivals

    Inspired by your browsing history


    Your review has been submitted!

    You've already reviewed this product!