Delay Analysis in Construction Contracts
Home > Science, Technology & Agriculture > Civil engineering, surveying and building > Delay Analysis in Construction Contracts
Delay Analysis in Construction Contracts

Delay Analysis in Construction Contracts

|
     0     
5
4
3
2
1




International Edition


About the Book

The most significant unanticipated costs on many construction projects are the financial impacts associated with delay and disruption to the works. Assessing these, and establishing a causal link from each delay event to its effect, contractual liability and the damages experienced as a direct result of each event, can be difficult and complex. This book is a practical guide to the process of delay analysis and includes an in-depth review of the primary methods of delay analysis, together with the assumptions that underlie the precise calculations required in any quantitative delay analysis. The techniques discussed can be used on projects of any size, under all forms of construction contract, both domestic and international. The authors discuss not only delay analysis techniques, but also their appropriateness under given circumstances, demonstrating how combined approaches may be applied where necessary. They also consider problematic issues including ‘who owns the float’, concurrent delay, early completion programmes, and disruption. The book has been brought fully up to date, including references to the latest publications from the CIOB, AACEI and SCL, as well as current case law. Broad in scope, the book discusses the different delay analysis approaches likely to be encountered on national and international projects, and features practical worked examples and case studies demonstrating the techniques commonly used by experienced practitioners. This is an invaluable resource to programmers and schedulers, delay analysts, contractors, architects, engineers and surveyors. It will also be of interest to clients’ professional advisors managing extension of time or delay claims, as well as construction lawyers who require a better understanding of the underlying assumptions on which many quantitative delay analyses are based. Reviews of First Edition "John Keane and Anthony Caletka are pukka analysts in that tricky area of delays, programming and extension of time. I highly recommend their book Delay Analysis in Construction Contracts. Buy the book." (Building Magazine, February 2009) "The book's stated purpose is to provide a practical guide for those interested in schedule delay analysis. It provides a good in–depth review of the most common delay analysis techniques.... An excellent book, full of practical tips for the reader and very timely in its publication. It is well worth the cost and a good read for anyone involved in schedule delay analysis." (Cost Engineering, February 2009) It achieves in spades its stated aim of being a practical guide for contractors, contract administrators, programmers and delay analysts, as well as construction lawyers who require a better understanding of the underlying assumptions on which many quantitative delay analyses are based. (Construction Law Journal, 2009)

Table of Contents:
About the Authors ix Preface to the Second Edition xi Preface to the First Edition xiii 1 Introduction 1 1.1 General 1 1.1.1 Purpose of this book 2 1.1.2 Guidance 4 1.1.3 Construction planning and programming 5 1.2 Construction delays 6 1.2.1 Identifying delays 6 1.2.2 Analysing construction delays 7 1.2.3 Delay claim life cycle 9 1.3 Burning issues in delay analysis 10 1.4 Presentation and case study 11 2 Construction Programmes 13 2.1 Introduction 13 2.1.1 Planning, programming and project controls 13 2.1.2 Elements of a successful project 15 2.2 Planning and programming 16 2.2.1 Project planning 17 2.2.2 Work breakdown structure 18 2.3 CPM programming techniques: the fundamentals 21 2.3.1 Activity durations 22 2.3.2 Activity relationships 24 2.3.3 Event date calculations 28 2.3.4 Forward pass 30 2.3.5 Backward pass 32 2.3.6 Total float 34 2.3.7 Constraints 37 2.4 Baseline validation 38 2.4.1 Joint baseline review 38 2.4.2 Programme approval 38 2.4.3 The project baseline 41 2.5 Other planning techniques 41 2.5.1 PERT – Project Evaluation and Review Technique 41 2.5.2 Gantt charts (bar charts) 43 2.5.3 Line of balance 45 2.5.4 Critical chain method/theory of constraints 47 2.6 Why use CPM planning or scheduling techniques? 49 2.6.1 Project management 49 2.6.2 As-planned programmes 50 2.7 Project controls and the project control cycle 51 2.7.1 Progress monitoring 52 2.7.2 Process and analyse information – Earned Value Method 54 2.7.3 The cost and schedule performance curves 56 2.7.4 Time control 58 2.7.5 Programme updates 58 2.8 Records, records, records… 64 2.8.1 Electronic records: management and storage 66 2.8.2 Electronic records in practice 67 2.8.3 Document controls 68 2.9 Predatory programming practices 71 2.10 Guidance 72 3 Identification of Construction Delays 73 3.1 Establishing a basis for identifying delay 73 3.1.1 General requirements 74 3.1.2 Validation of an as-planned programme 75 3.2 Factual evidence and as-built programmes 77 3.2.1 As-built programme preparation 78 3.2.2 Summary 86 3.3 Identification of delay events 86 3.3.1 Delay identification 87 3.3.2 Recording delays 89 3.4 Identification and analysis of disruption 92 3.4.1 Disruption and delay 92 3.4.2 Calculating disruption 94 3.4.3 Establishing cause 95 3.4.4 Total cost claims/global claims 97 3.4.5 Measured mile 99 3.4.6 Graphical presentation 103 3.4.7 Summary 109 4 Analysis of Construction Delays 111 4.1 Introduction 111 4.1.1 The use of CPM techniques 111 4.1.2 Project planning software 113 4.1.3 Identifying delays: cause or effect? 115 4.2 Selection criteria and guidance 117 4.2.1 The SCL Delay and Disruption Protocol 118 4.2.2 The core statements of principle 120 4.2.3 AACEI Recommended Practice No. 29R-03: Forensic Schedule Analysis 124 4.2.4 Which technique to use under given circumstances 131 4.3 Summary 132 5 Delay Analysis Techniques 135 5.1 Introduction to delay analysis techniques 135 5.1.1 Additive methods of delay analysis 137 5.1.2 Impacted as-planned 137 5.1.3 Time impact analysis 142 5.1.4 Collapsed as-built 151 5.1.5 As-built based methods of analysis 159 5.1.6 Total time assessments (observational/static/gross) 162 5.1.7 As-planned versus as-built windows analysis 169 5.1.8 Contemporaneous windows analysis 172 5.1.9 Month-to-month update analysis 175 5.2 Summary 180 6 Problematic Issues 183 6.1 Introduction 183 6.2 Float and delay claims 183 6.2.1 General definitions: what is ‘float’? 183 6.2.2 How float is used 184 6.2.3 Float loss and the impact 187 6.2.4 Measurement of float loss 188 6.2.5 Who owns the float? 190 6.3 Concurrency 194 6.3.1 Definitions 195 6.3.2 Delay analysis and Concurrency 196 6.3.3 SCL Delay and Disruption Protocol 205 6.3.4 Delay scenarios 205 6.3.5 Common questions 208 6.3.6 Experience and common sense 209 6.3.7 The concept of pacing 210 6.4 Programme approvals and onerous specifications 211 6.4.1 Programme requirements, format and compliance 211 6.4.2 Approval or acceptance of construction programme 217 6.5 Acceleration and mitigation 218 6.5.1 Mitigation 218 6.5.2 Acceleration 219 6.5.3 Contractors’ right to early completion 221 7 Effective Presentation of Delay Analysis 223 7.1 Introduction 223 7.2 Case study: airport terminal expansion 223 7.2.1 Initial analysis by party-appointed planning experts 224 7.2.2 Using time impact analysis for prolongation 227 7.2.3 Tribunal planning expert’s contemporaneous approach 228 7.2.4 Runway Extension: are delays to the runway extension relevant? 230 7.2.5 Terminal Building: are delays to the terminal building relevant? 231 7.3 Float mapping: approach and methodology 231 7.3.1 Extracting float values 233 7.3.2 Creating a float map 233 7.3.3 Identify driving activities 236 7.3.4 As-built critical path 237 7.4 Demonstrating acceleration 246 7.5 Presentation skills: demonstrative evidence 248 7.5.1 Demonstration 250 7.5.2 Reconstruction 251 7.5.3 Weather 252 7.5.4 Summary 252 Appendix 255 Glossary 259 Table of Cases 267 Index 271


Best Sellers


Product Details
  • ISBN-13: 9781118631171
  • Publisher: John Wiley and Sons Ltd
  • Binding: Hardback
  • Language: English
  • Returnable: N
  • Spine Width: 20 mm
  • Width: 168 mm
  • ISBN-10: 111863117X
  • Publisher Date: 12 Jun 2015
  • Height: 246 mm
  • No of Pages: 288
  • Returnable: N
  • Weight: 635 gr


Similar Products

Add Photo
Add Photo

Customer Reviews

REVIEWS      0     
Click Here To Be The First to Review this Product
Delay Analysis in Construction Contracts
John Wiley and Sons Ltd -
Delay Analysis in Construction Contracts
Writing guidlines
We want to publish your review, so please:
  • keep your review on the product. Review's that defame author's character will be rejected.
  • Keep your review focused on the product.
  • Avoid writing about customer service. contact us instead if you have issue requiring immediate attention.
  • Refrain from mentioning competitors or the specific price you paid for the product.
  • Do not include any personally identifiable information, such as full names.

Delay Analysis in Construction Contracts

Required fields are marked with *

Review Title*
Review
    Add Photo Add up to 6 photos
    Would you recommend this product to a friend?
    Tag this Book Read more
    Does your review contain spoilers?
    What type of reader best describes you?
    I agree to the terms & conditions
    You may receive emails regarding this submission. Any emails will include the ability to opt-out of future communications.

    CUSTOMER RATINGS AND REVIEWS AND QUESTIONS AND ANSWERS TERMS OF USE

    These Terms of Use govern your conduct associated with the Customer Ratings and Reviews and/or Questions and Answers service offered by Bookswagon (the "CRR Service").


    By submitting any content to Bookswagon, you guarantee that:
    • You are the sole author and owner of the intellectual property rights in the content;
    • All "moral rights" that you may have in such content have been voluntarily waived by you;
    • All content that you post is accurate;
    • You are at least 13 years old;
    • Use of the content you supply does not violate these Terms of Use and will not cause injury to any person or entity.
    You further agree that you may not submit any content:
    • That is known by you to be false, inaccurate or misleading;
    • That infringes any third party's copyright, patent, trademark, trade secret or other proprietary rights or rights of publicity or privacy;
    • That violates any law, statute, ordinance or regulation (including, but not limited to, those governing, consumer protection, unfair competition, anti-discrimination or false advertising);
    • That is, or may reasonably be considered to be, defamatory, libelous, hateful, racially or religiously biased or offensive, unlawfully threatening or unlawfully harassing to any individual, partnership or corporation;
    • For which you were compensated or granted any consideration by any unapproved third party;
    • That includes any information that references other websites, addresses, email addresses, contact information or phone numbers;
    • That contains any computer viruses, worms or other potentially damaging computer programs or files.
    You agree to indemnify and hold Bookswagon (and its officers, directors, agents, subsidiaries, joint ventures, employees and third-party service providers, including but not limited to Bazaarvoice, Inc.), harmless from all claims, demands, and damages (actual and consequential) of every kind and nature, known and unknown including reasonable attorneys' fees, arising out of a breach of your representations and warranties set forth above, or your violation of any law or the rights of a third party.


    For any content that you submit, you grant Bookswagon a perpetual, irrevocable, royalty-free, transferable right and license to use, copy, modify, delete in its entirety, adapt, publish, translate, create derivative works from and/or sell, transfer, and/or distribute such content and/or incorporate such content into any form, medium or technology throughout the world without compensation to you. Additionally,  Bookswagon may transfer or share any personal information that you submit with its third-party service providers, including but not limited to Bazaarvoice, Inc. in accordance with  Privacy Policy


    All content that you submit may be used at Bookswagon's sole discretion. Bookswagon reserves the right to change, condense, withhold publication, remove or delete any content on Bookswagon's website that Bookswagon deems, in its sole discretion, to violate the content guidelines or any other provision of these Terms of Use.  Bookswagon does not guarantee that you will have any recourse through Bookswagon to edit or delete any content you have submitted. Ratings and written comments are generally posted within two to four business days. However, Bookswagon reserves the right to remove or to refuse to post any submission to the extent authorized by law. You acknowledge that you, not Bookswagon, are responsible for the contents of your submission. None of the content that you submit shall be subject to any obligation of confidence on the part of Bookswagon, its agents, subsidiaries, affiliates, partners or third party service providers (including but not limited to Bazaarvoice, Inc.)and their respective directors, officers and employees.

    Accept

    New Arrivals

    Inspired by your browsing history


    Your review has been submitted!

    You've already reviewed this product!