Buy Models for Financing, Cost and Risk Assessment by Konrad Bergmeister
close menu
Bookswagon
search
My Account
Book 1
Book 2
Book 3
Book 1
Book 2
Book 3
Book 1
Book 2
Book 3
Book 1
Book 2
Book 3
Home > Science, Technology & Agriculture > Civil engineering, surveying and building > Models for Financing, Cost and Risk Assessment: Major Railway Tunnel Projects in Europe
Models for Financing, Cost and Risk Assessment: Major Railway Tunnel Projects in Europe

Models for Financing, Cost and Risk Assessment: Major Railway Tunnel Projects in Europe


     0     
5
4
3
2
1



International Edition


X
About the Book

Project managers of large railroad tunnels in Europe summarize their experiences. In addition to explaining the general conditions, they give an overview of financing, cost and risk management, scheduling, quality control and auditing.
The book address project manager of mayor infrastructure projects as well as decision makers, financers, engineers. Additionally, it provides valuable information for organizations that are responsible for future projects in politics and management.


Table of Contents:

Preface xi

1 Austria 1

1.1 Introduction 1

1.2 Concept 2

1.3 Financing 2

1.4 Cost Calculation 3

1.4.1 Basic Principles of Cost Calculation 3

1.4.2 Cost Assessment System 4

1.4.2.1 Basic Costs 5

1.4.2.2 Cost Coefficients for Value Adjustment and Inflation 7

1.4.2.3 Cost Coefficients for Risks 7

1.4.2.4 Cost Coefficients for Preliminary Monetary Adjustment 7

1.5 Cost Coefficients for Risks Corresponding to the Value of the ÖGG-Guideline 2005 7

1.5.1 Structure of the Cost Coefficients for Risks According to Project Phases 8

1.5.2 Structure of the Cost Coefficients for Risks According to Risk Spheres 8

1.5.3 Levels Used to Estimate the Cost Coefficients for Risks 9

1.5.4 Reference Values for Cost Coefficients for Risks – Planning Phase 10

1.5.4.1 Cost Coefficient UE 10

1.5.4.2 Cost Coefficient UB 11

1.5.5 Reference Values for Cost Coefficients for Risks – Execution Phase 12

1.6 Control 12

1.6.1 Project Cost Control 12

1.6.2 Project Cost Control in the Annual Control Loop 13

1.6.3 Project Phases 14

1.6.4 Levels of Cost Planning 14

1.6.5 Project Structuring 16

1.7 Change Management 16

1.8 Cost Coefficients for Risks Corresponding to the Value of the ÖGG-Guideline 2016 16

Abbreviations 18

References 18

2 Germany 19

2.1 Introduction 19

2.2 Plan for Maintaining and Expanding Rail Infrastructure 20

2.3 The 2030 Federal Transport Infrastructure Plan 20

2.3.1 Principles 20

2.3.2 The Key Changes Under the Requirements Plan Implementation Agreement 21

2.4 Financing 23

2.4.1 New Construction and Upgrades 23

2.4.2 Investment in Replacement Infrastructure on the Existing Network 25

2.4.3 Cost Breakdown on New Constructions and Upgrades and Replacement 26

2.5 Costs 27

2.5.1 Principles for Calculating Costs Based on the Final Report of the Reform Commission 27

2.5.2 Work Breakdown Structure for a Project 27

2.5.3 Determining the Basic Costs 29

2.5.3.1 Estimation of Construction Costs in the Preliminary Design Phase (‘Lph 1+2’, Section 55, HOAI) 29

2.5.3.2 Calculation of Construction Costs in the Final Design Phase (‘Lph 3+4’, Section 55, HOAI) 29

2.5.3.3 Design Cost Estimate in the Preliminary Design Phase (‘Lph 1+2’, Section 55, HOAI) 30

2.5.3.4 Calculation of design costs in the final design phase (‘Lph 3+4’, Section 55, HOAI) 30

2.5.4 Financial Contingency Reserve for Risks and Unpredicted Events 30

2.5.5 Inflation 31

2.5.6 Determining Total Costs in the Course of a Project 32

2.6 Risk Management 34

2.6.1 Corporate Risk Management 34

2.6.2 Project Risk Management 36

2.6.2.1 Openly Addressing Rather Than Suppressing Risks 37

2.6.2.2 A Realistic Perception Versus Forced Optimism 39

2.6.2.3 Acting Early to Manage Crises Rather Than Firefighting 39

2.6.2.4 Creating Opportunities 39

2.6.2.5 Timely Use of Communication Channels 39

Abbreviations 40

Further Reading 40

3 Norway 43

3.1 Concept, Background, and a Description of the Follo Line Project 43

3.1.1 Objective 43

3.1.2 The National Transportation Plan (NTP) 43

3.1.3 Follo Line Project 45

3.1.4 Responsibilities 47

3.1.5 Project Strategy 47

3.2 Finance 48

3.2.1 Structure of the Cost Estimate 49

3.3 Cost 51

3.4 Project Schedule 52

3.5 Risk Management 53

3.5.1 Identify Risk 53

3.5.2 Quantify Risk 54

3.5.3 Risk Treatment 54

3.5.4 Follow-Up and Report 54

3.6 Controlling 56

3.6.1 Progress, Schedule, and Cost Control 56

3.6.2 Work Breakdown Structure (WBS) 56

3.6.3 Project Phases 56

3.6.4 Progress, Schedule, and Cost Control 56

3.6.5 Planning Basis 56

3.6.6 Commitment Control 56

3.6.7 Estimated Cost at Completion 58

3.7 Trend and Change Control for the Project 58

3.7.1 Change Control 58

Abbreviations 60

Further Reading 60

4 Slovenia 61

4.1 Introduction 61

4.2 Responsibilities 62

4.2.1 Railway Infrastructure Investments 62

4.2.2 Infrastructure Management 63

4.3 Planning Background 63

4.4 Development Goals 64

4.5 Financing Sources 65

4.5.1 State Budget 65

4.5.2 EU Grants 66

4.6 Cost Estimates 66

4.7 Risk Management 68

4.8 Controlling and Reporting 70

4.8.1 Investment Documentation 72

4.8.2 EU Funds 72

4.9 Project Second Track Divaèa–Koper 73

4.9.1 Concept, Background, and Description of the Project 73

4.9.1.1 Objective 73

4.9.1.2 Transportation Strategy and National Programme 73

4.9.1.3 Project Description 73

4.9.1.4 Status of the Project 76

4.9.1.5 Responsibilities 77

4.9.2 Financing 78

4.9.3 Project Phases 79

4.9.4 Project Cost Estimate 80

4.9.4.1 Elaborating Basic Costs 80

4.9.4.2 Cost Estimations for Tunnels T1 and T2 – Occurrence of Karst Phenomena 82

4.9.5 Project Contingencies 87

4.9.6 Cost Estimate Overview 90

4.9.7 Sensitivity Analysis and Risk Assessment 91

4.9.7.1 Sensitivity Analysis 91

4.9.7.2 Probabilistic Risk Analysis 91

4.9.7.3 Qualitative Risk Analyses 93

4.9.8 Controlling 94

Abbreviations 99

5 Switzerland 101

5.1 Introduction 101

5.2 Responsibilities 101

5.2.1 The Principal 102

5.2.2 The Constructors 102

5.2.3 The Operating Companies 103

5.3 Financing by the FinöV Fund (1998–2015) 103

5.3.1 Revenues from Duties and Taxes 104

5.3.2 The Advance 104

5.3.3 Inflation 104

5.3.4 Financing Terms 105

5.4 Financing by BIF (from 2016) 106

5.4.1 Functioning of the Fund and Main Features of Railway Infrastructure Financing 106

5.4.2 Revenues from Duties and Taxes 107

5.4.3 The Advance 108

5.4.4 Inflation 108

5.4.5 Cost Calculation According to FOT Guidelines 108

5.5 Risks 109

5.5.1 Principle 109

5.5.2 Intention 109

5.5.3 Risks and Tasks 109

5.5.4 Procedure 110

5.5.4.1 Risk Identification 110

5.5.4.2 Risk Evaluation 110

5.5.4.3 Risk Assessment 111

5.5.4.4 Risk Strategy 111

5.5.4.5 Documentation of Risk Management 111

5.6 Costs 112

5.6.1 Presumed End Cost 112

5.6.2 Presumed End Costs and Risk Potentials of the Gotthard Axis (Gotthard and Ceneri Base Tunnels) 112

5.6.3 Controlling the Performance, Deadlines, and Costs 113

5.6.4 Project Structure Plan 113

5.6.5 Phase Structure 113

5.6.6 Cost Types 113

5.6.7 Performance Control 113

5.6.8 Performance Reference Basis 114

5.6.9 Performance Situation and Prognosis 115

5.6.10 Order Control 115

5.6.11 Cost Control 115

5.6.12 Billing 115

5.6.13 Change Management – Process Flow of the Change Procedure 115

Abbreviations 116

DETEC: Federal Department of the Environment, Transport, Energy, and Communications Terms and Definitions 117

Further Reading 121

6 Brenner Base Tunnel: Transnational Project between Austria and Italy 123

6.1 Brenner Base Tunnel Project 123

6.1.1 Project Content: Studies, Planning, Approvals 123

6.2 Approval Phase and Financing 126

6.2.1 Approvals and Financing in Italy 126

6.2.2 Approvals and Financing in Austria 126

6.2.3 European Approval and Financing 127

6.2.3.1 EU Budget and TEN-T Programme 127

6.2.3.2 EU Institutions Involved in Funding 128

6.2.3.3 Structure of the European Funding 128

6.2.3.4 TEN-T Programme 2007–2013 and Former Programmes 129

6.2.3.5 CEF Programme 2014–2020 129

6.3 Cost Models 129

6.3.1 Cost Calculation and Risk Provision in Italy 129

6.3.2 Calculation of Total Costs, Including Risk Provision, Adjustment for Inflation, and Preliminary Cost Adjustment in Austria 130

6.4 Cost Calculation and Risk Provision for the BBT 130

6.4.1 Calculation of Risk Provision for Identifiable and Quantifiable Risks 131

6.4.2 Calculation of Risk Provision According to the ÖGG Directive 135

Abbreviations 136

References 136

7 Lyon–Turin: Transnational Project between Italy and France 139

7.1 Concept 139

7.1.1 Objective 139

7.1.2 The TEN-T Trans-European Transport Network 139

7.1.3 The Project 139

7.1.4 Responsibilities 141

7.1.5 Finance 142

7.2 Costs 143

7.3 Risk Provision 143

7.4 Control 144

7.5 Variation Procedures 145

Abbreviations 145

Further Reading 145

8 Conclusion: Essential Elements of Cost and Risk Management 147

Past and Present Participants 151



About the Author :
Ernst & Young is a global leader in professional services with some 114,000 people based in 140 countries. Around the world the firm is committed to pursuing the highest levels of integrity, quality, and professionalism in delivering a broad inventory of services to their clients. By connecting their people's talents, Ernst & Young provides solutions to clients based on financial, transactional, and risk-management knowledge in its core services of audit, tax, and transactions.
The International Financial Reporting Group of Ernst & Young includes financial reporting specialists from throughout the world. Die Gruppe "Projektleiter der langen Eisenbahn-Alpentunne" wurde 1993 auf Initiative der SBB gegründet. Zunächst waren die beiden Projektleiter aus den Basistunneln Mont-Cenis (heute Lyon-Turin) und Gotthard beteiligt. Später wurden die Verantwortlichen für die Basistunnelprojekte Semmering, Brenner und Lötschberg sowie für den Kanaltunnel in die Gruppe aufgenommen, die nun "Projektleiter lange Tunnel" heißt. Die Gruppe trifft sich seit über 20 Jahren ca. zweimal im Jahr zum Informations- und Erfahrungsaustausch. Die Zusammensetzung dieser Gruppe und der wertvolle Erfahrungsaustausch haben zu kostengünstigen und funktionalen Lösungen geführt.


Best Sellers


Product Details
  • ISBN-13: 9783433033142
  • Publisher: Wiley-VCH Verlag GmbH
  • Publisher Imprint: Wilhelm Ernst & Sohn Verlag fur Architektur und technische Wissenschaften
  • Height: 241 mm
  • No of Pages: 176
  • Spine Width: 10 mm
  • Weight: 392 gr
  • ISBN-10: 3433033145
  • Publisher Date: 22 Dec 2021
  • Binding: Paperback
  • Language: English
  • Returnable: N
  • Sub Title: Major Railway Tunnel Projects in Europe
  • Width: 170 mm


Similar Products

Add Photo
Add Photo

Customer Reviews

REVIEWS      0     
Click Here To Be The First to Review this Product
Models for Financing, Cost and Risk Assessment: Major Railway Tunnel Projects in Europe
Wiley-VCH Verlag GmbH -
Models for Financing, Cost and Risk Assessment: Major Railway Tunnel Projects in Europe
Writing guidlines
We want to publish your review, so please:
  • keep your review on the product. Review's that defame author's character will be rejected.
  • Keep your review focused on the product.
  • Avoid writing about customer service. contact us instead if you have issue requiring immediate attention.
  • Refrain from mentioning competitors or the specific price you paid for the product.
  • Do not include any personally identifiable information, such as full names.

Models for Financing, Cost and Risk Assessment: Major Railway Tunnel Projects in Europe

Required fields are marked with *

Review Title*
Review
    Add Photo Add up to 6 photos
    Would you recommend this product to a friend?
    Tag this Book Read more
    Does your review contain spoilers?
    What type of reader best describes you?
    I agree to the terms & conditions
    You may receive emails regarding this submission. Any emails will include the ability to opt-out of future communications.

    CUSTOMER RATINGS AND REVIEWS AND QUESTIONS AND ANSWERS TERMS OF USE

    These Terms of Use govern your conduct associated with the Customer Ratings and Reviews and/or Questions and Answers service offered by Bookswagon (the "CRR Service").


    By submitting any content to Bookswagon, you guarantee that:
    • You are the sole author and owner of the intellectual property rights in the content;
    • All "moral rights" that you may have in such content have been voluntarily waived by you;
    • All content that you post is accurate;
    • You are at least 13 years old;
    • Use of the content you supply does not violate these Terms of Use and will not cause injury to any person or entity.
    You further agree that you may not submit any content:
    • That is known by you to be false, inaccurate or misleading;
    • That infringes any third party's copyright, patent, trademark, trade secret or other proprietary rights or rights of publicity or privacy;
    • That violates any law, statute, ordinance or regulation (including, but not limited to, those governing, consumer protection, unfair competition, anti-discrimination or false advertising);
    • That is, or may reasonably be considered to be, defamatory, libelous, hateful, racially or religiously biased or offensive, unlawfully threatening or unlawfully harassing to any individual, partnership or corporation;
    • For which you were compensated or granted any consideration by any unapproved third party;
    • That includes any information that references other websites, addresses, email addresses, contact information or phone numbers;
    • That contains any computer viruses, worms or other potentially damaging computer programs or files.
    You agree to indemnify and hold Bookswagon (and its officers, directors, agents, subsidiaries, joint ventures, employees and third-party service providers, including but not limited to Bazaarvoice, Inc.), harmless from all claims, demands, and damages (actual and consequential) of every kind and nature, known and unknown including reasonable attorneys' fees, arising out of a breach of your representations and warranties set forth above, or your violation of any law or the rights of a third party.


    For any content that you submit, you grant Bookswagon a perpetual, irrevocable, royalty-free, transferable right and license to use, copy, modify, delete in its entirety, adapt, publish, translate, create derivative works from and/or sell, transfer, and/or distribute such content and/or incorporate such content into any form, medium or technology throughout the world without compensation to you. Additionally,  Bookswagon may transfer or share any personal information that you submit with its third-party service providers, including but not limited to Bazaarvoice, Inc. in accordance with  Privacy Policy


    All content that you submit may be used at Bookswagon's sole discretion. Bookswagon reserves the right to change, condense, withhold publication, remove or delete any content on Bookswagon's website that Bookswagon deems, in its sole discretion, to violate the content guidelines or any other provision of these Terms of Use.  Bookswagon does not guarantee that you will have any recourse through Bookswagon to edit or delete any content you have submitted. Ratings and written comments are generally posted within two to four business days. However, Bookswagon reserves the right to remove or to refuse to post any submission to the extent authorized by law. You acknowledge that you, not Bookswagon, are responsible for the contents of your submission. None of the content that you submit shall be subject to any obligation of confidence on the part of Bookswagon, its agents, subsidiaries, affiliates, partners or third party service providers (including but not limited to Bazaarvoice, Inc.)and their respective directors, officers and employees.

    Accept


    Inspired by your browsing history


    Your review has been submitted!

    You've already reviewed this product!