About the Book
Please note that the content of this book primarily consists of articles available from Wikipedia or other free sources online. Pages: 115. Chapters: Post and lintel, Trombe wall, Project Labor Agreement, Lean construction, Timber framing, Architect-led Design-Build, Voided biaxial slab, Brickwork, Formwork, Shop drawing, Tilt up, Construction bidding, Tin can wall, General contractor, Unfinished building, Sustainable flooring, Life Safety Code, Infill, Virtual Design and Construction, Manufactured housing, Joint, Design-bid-build, Dead and live loads, Concrete cancer, Kinetic architecture, Damp proofing, Cavity wall, Shoring, Interior protection, Facility condition assessment, Concrete slab, Form liner, Overhang, Wall stud, Facility Condition Index, 1:5:200, Trench, Topping out, Underpinning, Lath and plaster, Falsework, Membrane roofing, Masonry veneer, Cut, Catastrophic failure, Structural load, Construction waste, Thin-shell structure, Project Agreements, Cut and fill, Rubble, Construction permit, Builders' rites, Tie, Mole, Off-site construction, Purlin, Superstructure, Construction delay, Rubblization, Fill dirt, Safety by design, Window capping, Concrete cover, Free floating screed, Whitetopping, Construction trailer, Post in ground, Elemental cost planning, Blocking, Shelf angle, Joist, Rapid construction, 16 Divisions, Rafter, Embankment, Moling, Monocrete construction, Dwang, First fix and second fix, Mitigation of seismic motion, Lift slab construction, All-in rate, Sill plate, Trench shoring, Cross bracing, Government contractor, Roof deck, Trench shield, Geologic preliminary investigation, Lookout, Fill trestle, Fast-track construction, Gravity-based structure, Off-site fabrication, Birdsmouth joint, Strongback, Fast fracture, Siamese connection, Subsurface utilities, Soil Stockpile, Full envelope subcontractor, Rim joist, Survey stakes. Excerpt: A Project Labor Agreement (PLA), also known as a Community Workforce Agreement, is a pre-hire collective...