Guidelines for Evaluating Process Plant Buildings for External Explosions and Fires
Book 1
Book 2
Book 3
Book 1
Book 2
Book 3
Book 1
Book 2
Book 3
Book 1
Book 2
Book 3
Home > Science, Technology & Agriculture > Civil engineering, surveying and building > Building construction and materials > Fire protection and safety > Guidelines for Evaluating Process Plant Buildings for External Explosions and Fires
Guidelines for Evaluating Process Plant Buildings for External Explosions and Fires

Guidelines for Evaluating Process Plant Buildings for External Explosions and Fires


     0     
5
4
3
2
1



Out of Stock


Notify me when this book is in stock
X
About the Book

This book is dedicated to the memory and spirit of Donald F. Othmer. Though there are many industry practices for building design and siting, they do not always apply to all sectors of the industry, or ensure consistent levels of safety. This practical book, written by the same author as "API Recommended Practice 752", provides the details to implement the recommended practice, "Management of Hazards Associated with Location of Process Plant Buildings." Its contents include safety guidelines on fire and explosion risks to process plant buildings as a result of events external to the building, which can apply across the spectrum of industries, and to conditions at any site. The book also offers guidance on assessing, screening, and managing risks associated with building design and siting. Two appendices give extensive coverage of explosion and fire phenomena, and effects and principles of blast resistant design.

Table of Contents:
Preface. Acknowledgments. Chapter 1. Introduction. 1.1. Objective and Scope. 1.2. Background. 1.3. Evolution of Design and Siting Practices for Buildings in Process Plants. 1.3.1. Brief History of Building Designs. 1.3.2. Standards for Building and Equipment Siting and Separation for Site-Specific Evaluation. Chapter 2. Management Overview. 2.1. Explosion and Fire Phenomena. 2.2. Statement of the Problem. 2.3. Analysis Approach. Chapter 3. Initial Screening and Consequences Screening. 3.1. Process and Plant Documentation. 3.2. Initial Screening. 3.2.1. Initial Screening for Events of Concern Through Identification of Materials and Conditions Present at the Specific Site. 3.2.2. Conduct Initial Screening through Applying Occupancy or Functional Criteria of Concern. 3.3. Consequence Screening. 3.3.1. Consequence Screening by Comparison to Design and Spacing Criteria. 3.3.2. Consequence Screening by Modeling Site-Specific Conditions. Chapter 4. Risk Screening. 4.1. Derivation and Presentation of Risk. 4.2. Interpretation and Use of Risk Measures. 4.2.1. Use of Individual risk Measures. 4.2.2. Use of Aggregate risk Measures. 4.3. Overview of Risk-Screening Approach. 4.3.1. Process Plant Buildings Explosion Exposure. 4.3.2. Building Types. 4.3.3. Estimate of Building Damage and Probability of Serous or Fatal Injury. 4.3.4. Approximate Event Frequency Determination. 4.3.5. Risk Estimates. Chapter 5. Risk Assessment. 5.1. Hazard Identification and Evaluation. 5.2. Techniques Used to Evaluate Hazards to Buildings in Process Plants. 5.3. Key Factors to Consider in Process Plant Building Risk Assessments. 5.3.1. Selecting Scenarios for Study. 5.3.2. Explosion Consequence Evaluation. 5.3.3. Fire Consequence Evaluation. 5.3.4. Frequency Evaluation. 5.4. Qualitative Risk Assessment. 5.4.1. Qualitative Consequence Evaluation. 5.4.2. Qualitative Frequency Evaluation. 5.4.3. Qualitative Risk Evaluation. 5.5. Quantitative Risk Analysis. 5.5.1. Quantitative Consequence Evaluation. 5.5.2. Quantitative Frequency Evaluation. 5.5.3. Quantitative Risk Determination. Chapter 6. Risk Management. 6.1. Risk Management Overview. 6.1.1. Managing Risk to Process Plant Buildings. 6.1.2. Deciding When to use QRA. 6.2. Reducing Risk to Buildings in Process Plants. 6.2.1. Functional Risk-Reduction Measures. 6.2.2. Preventive Risk-Reduction Measures. 6.2.3. Mitigative Risk-Reduction Measures. 6.2.4. Criteria for Mitigating Risk from Blast Effects. 6.2.5. Upgrading Buildings to Increase Blast Resistance. 6.3. Choosing among Risk-Reduction Alternatives. Chapter 7. Future Developments. 7.1. Definitions and Use of Building Occupancy Criteria. 7.2. Determination of Occupant Vulnerabilities as a Function of Building Damage. 7.3. Development of Generic Frequency Data to Improve Risk-Screening Tools. 7.4. Development of Company-Specific Risk Tolerance Criteria. 7.5. Improved Options for Risk Reduction. Appendix A. Explosion and Fire Phenomena and effects. A.1. Explosion and Fire Phenomena. A.1.1. Explosions. A.1.2. Fires. A.2. Evaluating Characteristics of Explosions and Fires. A2.1. Explosions. A.2.2. Jet Fires: Direct Contact and Conduction. A.3. Effects of Explosion on Buildings. Appendix B. Principles of Blast-Resistant Design. B.1. Evaluation of Structural Response to Blast Pressure. B.1.1. Introduction. B.1.2. Approximate Analytical Techniques. B.1.3. Finite Element Approach. B.2. Assessment of Building Damage and Probability of Serious Injuries/Fatalities. B.3. Pressure-Impulse Diagrams. B.4. Evaluation of Structural Response to Fragments and Ground Shock. B.4.1. Fragments. B.4.2. Ground Shock. B.5. Blast-Resistant Design and Construction. B.5.1. Blast Design Criteria. B.5.2. Ductile Design Considerations. B.5.3. Plant Layout and Spacing Considerations. References. Glossary. Index.


Best Sellers


Product Details
  • ISBN-13: 9780816906468
  • Publisher: American Institute of Chemical Engineers
  • Publisher Imprint: American Institute of Chemical Engineers
  • Height: 233 mm
  • Returnable: N
  • Weight: 502 gr
  • ISBN-10: 0816906467
  • Publisher Date: 15 Sep 1996
  • Binding: Hardback
  • Language: English
  • Spine Width: 19 mm
  • Width: 162 mm


Similar Products

Add Photo
Add Photo

Customer Reviews

REVIEWS      0     
Click Here To Be The First to Review this Product
Guidelines for Evaluating Process Plant Buildings for External Explosions and Fires
American Institute of Chemical Engineers -
Guidelines for Evaluating Process Plant Buildings for External Explosions and Fires
Writing guidlines
We want to publish your review, so please:
  • keep your review on the product. Review's that defame author's character will be rejected.
  • Keep your review focused on the product.
  • Avoid writing about customer service. contact us instead if you have issue requiring immediate attention.
  • Refrain from mentioning competitors or the specific price you paid for the product.
  • Do not include any personally identifiable information, such as full names.

Guidelines for Evaluating Process Plant Buildings for External Explosions and Fires

Required fields are marked with *

Review Title*
Review
    Add Photo Add up to 6 photos
    Would you recommend this product to a friend?
    Tag this Book Read more
    Does your review contain spoilers?
    What type of reader best describes you?
    I agree to the terms & conditions
    You may receive emails regarding this submission. Any emails will include the ability to opt-out of future communications.

    CUSTOMER RATINGS AND REVIEWS AND QUESTIONS AND ANSWERS TERMS OF USE

    These Terms of Use govern your conduct associated with the Customer Ratings and Reviews and/or Questions and Answers service offered by Bookswagon (the "CRR Service").


    By submitting any content to Bookswagon, you guarantee that:
    • You are the sole author and owner of the intellectual property rights in the content;
    • All "moral rights" that you may have in such content have been voluntarily waived by you;
    • All content that you post is accurate;
    • You are at least 13 years old;
    • Use of the content you supply does not violate these Terms of Use and will not cause injury to any person or entity.
    You further agree that you may not submit any content:
    • That is known by you to be false, inaccurate or misleading;
    • That infringes any third party's copyright, patent, trademark, trade secret or other proprietary rights or rights of publicity or privacy;
    • That violates any law, statute, ordinance or regulation (including, but not limited to, those governing, consumer protection, unfair competition, anti-discrimination or false advertising);
    • That is, or may reasonably be considered to be, defamatory, libelous, hateful, racially or religiously biased or offensive, unlawfully threatening or unlawfully harassing to any individual, partnership or corporation;
    • For which you were compensated or granted any consideration by any unapproved third party;
    • That includes any information that references other websites, addresses, email addresses, contact information or phone numbers;
    • That contains any computer viruses, worms or other potentially damaging computer programs or files.
    You agree to indemnify and hold Bookswagon (and its officers, directors, agents, subsidiaries, joint ventures, employees and third-party service providers, including but not limited to Bazaarvoice, Inc.), harmless from all claims, demands, and damages (actual and consequential) of every kind and nature, known and unknown including reasonable attorneys' fees, arising out of a breach of your representations and warranties set forth above, or your violation of any law or the rights of a third party.


    For any content that you submit, you grant Bookswagon a perpetual, irrevocable, royalty-free, transferable right and license to use, copy, modify, delete in its entirety, adapt, publish, translate, create derivative works from and/or sell, transfer, and/or distribute such content and/or incorporate such content into any form, medium or technology throughout the world without compensation to you. Additionally,  Bookswagon may transfer or share any personal information that you submit with its third-party service providers, including but not limited to Bazaarvoice, Inc. in accordance with  Privacy Policy


    All content that you submit may be used at Bookswagon's sole discretion. Bookswagon reserves the right to change, condense, withhold publication, remove or delete any content on Bookswagon's website that Bookswagon deems, in its sole discretion, to violate the content guidelines or any other provision of these Terms of Use.  Bookswagon does not guarantee that you will have any recourse through Bookswagon to edit or delete any content you have submitted. Ratings and written comments are generally posted within two to four business days. However, Bookswagon reserves the right to remove or to refuse to post any submission to the extent authorized by law. You acknowledge that you, not Bookswagon, are responsible for the contents of your submission. None of the content that you submit shall be subject to any obligation of confidence on the part of Bookswagon, its agents, subsidiaries, affiliates, partners or third party service providers (including but not limited to Bazaarvoice, Inc.)and their respective directors, officers and employees.

    Accept

    Fresh on the Shelf


    Inspired by your browsing history


    Your review has been submitted!

    You've already reviewed this product!