This exceptionally produced trainee guide features a highly illustrated design, technical hints and tips from industry experts, review questions and a whole lot more! Key content includes System Layout, Inspection, Testing, and Maintenance, Special Extinguishing Systems, Introductory Skills for the Foreman and Proper Procedures and Documentation.
Instructor Supplements
Instructors: Product supplements may be ordered directly through OASIS at http://oasis.pearson.com. For more information contact your Pearson NCCER/Contren Sales Specialist at http://nccer.pearsonconstructionbooks.com/store/sales.aspx.
- Annotated Instructor's Guide Paperback 0-13-614440-3
- Computerized Testing Software 0-13-614787-9
- Transparency Masters 0-13-614803-4
Table of Contents:
(Total Level Hours: 145)
18401-08 System Layout (45 Hours)
Identifies and explains basic hydraulic concepts and selection of hydraulic design methods. System configuration, design criteria, discharge characteristics, and types of pressure loss are explained. Performing fire sprinkler system hydraulic calculations is also covered in this module.
18402-08 Inspection, Testing, and Maintenance (17.5 Hours)
Identifies and explains initial and periodic testing and inspection requirements, as well as maintenance and repair of wet pipe systems, dry pipe systems, preaction/deluge systems, and special systems.
18403-08 Special Extinguishing Systems (42.5 Hours)
Identifies and explains the following extinguishing exposure systems: water spray, foam, carbon dioxide, Halon, auxiliary and local alarm. Limited water systems, fire extinguishers, and water mist suppression systems are also covered.
18404-08 Introductory Skills for the Foreman (20 Hours) Introduces the trainee to foremanship and covers responsibilities, leadership, and safety. Also explains project documentation and reports related to materials tracking and labor tracking.
18405-08 Proper Procedures and Documentation (20 Hours) Explains the importance of proper documentation to ensure correct installation and avoid future rework and possible unintentional releases. Emphasizes the need to properly document the actual installation using written reports and photographs. Includes causes of and responses to water damage, and provides a detailed case history of an unintentional release.